Added tunnels under bridges at exits 14 and 15 (see new screenshot), added soundwall at exit 14.
0 Comments
Added crash barrier and lightposts on exit 16 (this was actually quite some work).
Begin of building Baker State Hwy (BSH) wich will be used by line 3 and 28. Added crash barrier and lightposts to Fwy 31 upto exit 16. Added route helpers for line 3 and 28.
Build exit 16 where Fwy 31 is connected with Baker State Highway, line 3 and 28 will use this exit.
Calculated gradients, lenghts and such for exit 16, and begin building.
Build large part of Fwy 31 with some minor (600ft/180m) roadworks.
Added lightpoles and trafficlights. Edited some trafficsigns on Fwy 31. Build more of Fwy 31.
Build "Burbeck Park+Ride Busstation" and the Park&Ride facility.
Edited the bridge at exit 14 (Freeway 31 to Burbeck Park&Ride Busstation), now there's an underpass
which makes the bridge less high. |